Replacing electrical equipment across an occupied property starts with knowing what serves whom. We help apartment owners, property managers and HOA boards plan shared service upgrades, meter-bank replacement and panels inside individual units across Los Angeles and Ventura counties.
Request a multifamily walkthrough
Start with the equipment you know. If the scope crosses several systems, we can assess them together.
Main service equipment, switchgear, house loads and power for common areas or elevators.
Explore distribution upgradesGrouped meters serving apartments, common areas or commercial space at the same property.
Plan meter-bank replacementA single apartment panel or a coordinated replacement program across multiple occupied units.
Plan in-unit panel replacementNot sure where the problem starts? Share the city, known equipment concerns and approximate number of buildings or units. Existing records help; you do not need drawings to start.
Two completed projects show how metering and unit-panel work can be scoped together.
14 buildings and a clubhouse. The completed scope included 532 meters, approximately 350 in-unit subpanel replacements and 15 common-area/elevator switchgear assemblies.
Review the Culver City projectEight meters and nine subpanels. A smaller completed multifamily upgrade, documented with photographs of the exterior metering work.
Review the Los Feliz projectChoose the scope that fits your project.
A problem inside one apartment may involve equipment shared by the building. We review the relationship between the service, meters, feeders, house loads and unit subpanels. That helps the property team distinguish an individual repair from a wider equipment upgrade.
Our work includes coordination with utilities, engineers, tenants and HOA or management representatives. We discuss who provides access, who communicates with occupants and how the installation will be sequenced. Temporary power can be assessed where it is needed; continuous power is not assumed.
From our project photographs
The meter-bank replacement involved two sections, each with a 400A disconnect and 24 meters. These photographs show existing equipment, installation work and the installed equipment on both sides.




Views from different stages and sections of the same project.
Yes. Our multifamily work includes multi-meter equipment, switchgear, house panels and unit subpanels. We review how those parts are connected before agreeing on the replacement scope.
Access and interruption arrangements depend on the property and the installation. We discuss the affected units and common systems with the property contact so notices and any special arrangements can be planned.
Phasing depends on the equipment configuration, condition and utility requirements. Some work may be staged; other equipment needs a complete replacement and shutdown. We assess feasible options before recommending a sequence.
BEFORE WE QUOTE THE WORK
A fault inside one unit may sit downstream of equipment shared by the property. Distinguish branch circuits, unit feeders, meter equipment, the building service and common-area loads. Management needs to understand which parts are involved before deciding whether the job is a unit repair or a capital improvement.
Secured electrical rooms, resident access and shared systems affect the schedule. Proposed heat pumps, electric cooking and EV charging can change the building load picture. Review capacity and utility requirements before selecting new distribution equipment. A metering project also needs unit identification and a practical outage plan.
The scope should identify testing, labels, permits and inspections, plus wall or surface repairs. Confirm who receives the equipment information and circuit directories. Those records give management and future contractors a reliable starting point.
Utility planning references: LADWP requirements · SCE requirements