Skip to content
Ai Builders Electric
Discuss your projectContact

Electrical services / Greater Los Angeles

Electrical upgrades for occupied apartment and condo buildings

Replacing electrical equipment across an occupied property starts with knowing what serves whom. We help apartment owners, property managers and HOA boards plan shared service upgrades, meter-bank replacement and panels inside individual units across Los Angeles and Ventura counties.

Request a multifamily walkthrough
A wide view of multiple meter sections and a central service cabinet connected to overhead conduits.
Meter-bank installation at our completed Culver City multifamily project. See the full scope

Which part of the property needs work?

Start with the equipment you know. If the scope crosses several systems, we can assess them together.

Shared service & distribution

Main service equipment, switchgear, house loads and power for common areas or elevators.

Explore distribution upgrades

Meter banks & meter stacks

Grouped meters serving apartments, common areas or commercial space at the same property.

Plan meter-bank replacement

Not sure where the problem starts? Share the city, known equipment concerns and approximate number of buildings or units. Existing records help; you do not need drawings to start.

Experience at different property scales.

Two completed projects show how metering and unit-panel work can be scoped together.

Culver City

14 buildings and a clubhouse. The completed scope included 532 meters, approximately 350 in-unit subpanel replacements and 15 common-area/elevator switchgear assemblies.

Review the Culver City project

Los Feliz

Eight meters and nine subpanels. A smaller completed multifamily upgrade, documented with photographs of the exterior metering work.

Review the Los Feliz project

Browse multifamily services

Choose the scope that fits your project.

Metering, service equipment and unit panels
Older panels, wiring and condition reports
Common areas, parking and shared charging

Connect the building scope to each unit

A problem inside one apartment may involve equipment shared by the building. We review the relationship between the service, meters, feeders, house loads and unit subpanels. That helps the property team distinguish an individual repair from a wider equipment upgrade.

Coordinate the people as well as the equipment

Our work includes coordination with utilities, engineers, tenants and HOA or management representatives. We discuss who provides access, who communicates with occupants and how the installation will be sequenced. Temporary power can be assessed where it is needed; continuous power is not assumed.

Define which future additions belong in today’s review

Bring a short equipment brief when a replacement project may also involve EV charging, electric appliances or other new loads. Identify the supply area and the stage of each proposed addition.

Current replacement
List the equipment already included in the proposed work and what it serves. Keep unit panels, shared metering and common-area distribution identified separately.
Defined near-term additions
Provide the planned equipment and manufacturer information, quantity, location and intended timing. State whether the proposed load belongs to a unit, common area or shared parking.
Later options
Describe additions still under consideration and who will decide them. Ask which design questions need answering now and which work should remain a separately priced option.

The assessment can consider equipment selection, load management and service changes as appropriate. An available breaker space or a larger cabinet does not establish capacity for a new load.

SCE describes possible alternatives to service upsizing. For shared charging, PNNL recommends a professional electrical assessment. The suitable approach depends on the property and proposed equipment.

From our project photographs

A closer look at the work.

Two sections of multifamily metering in Van Nuys

The meter-bank replacement involved two sections, each with a 400A disconnect and 24 meters. These photographs show existing equipment, installation work and the installed equipment on both sides.

An existing meter bank with four rows of round electric meters and service-disconnect handles.
BeforeAn existing meter bank with four rows of round electric meters and service-disconnect handles.
A crew member works beside an open service cabinet, cable terminations and a bank of electric meters.
During installationA crew member works beside an open service cabinet, cable terminations and a bank of electric meters.
A wide view of meter banks, service cabinets and conduit at a Van Nuys multifamily property.
Installed equipment · section AA wide view of meter banks, service cabinets and conduit at a Van Nuys multifamily property.
A bank of electric meters beside tall service-disconnect cabinets at a multifamily property in Van Nuys.
Installed equipment · section BA bank of electric meters beside tall service-disconnect cabinets at a multifamily property in Van Nuys.

Views from different stages and sections of the same project.

Explore all project photographs →

Common questions

Do you handle both shared equipment and in-unit subpanels?

Yes. Our multifamily work includes multi-meter equipment, switchgear, house panels and unit subpanels. We review how those parts are connected before agreeing on the replacement scope.

Will residents have to leave during the work?

Access and interruption arrangements depend on the property and the installation. We discuss the affected units and common systems with the property contact so notices and any special arrangements can be planned.

Can a project be divided into phases?

Phasing depends on the equipment configuration, condition and utility requirements. Some work may be staged; other equipment needs a complete replacement and shutdown. We assess feasible options before recommending a sequence.

Technical planning notes & references

BEFORE WE QUOTE THE WORK

Planning electrical work in an occupied building

Shared service, individual homes

A fault inside one unit may sit downstream of equipment shared by the property. Distinguish branch circuits, unit feeders, meter equipment, the building service and common-area loads. Management needs to understand which parts are involved before deciding whether the job is a unit repair or a capital improvement.

Coordinate access and future loads

Secured electrical rooms, resident access and shared systems affect the schedule. Proposed heat pumps, electric cooking and EV charging can change the building load picture. Review capacity and utility requirements before selecting new distribution equipment. A metering project also needs unit identification and a practical outage plan.

Leave useful records behind

The scope should identify testing, labels, permits and inspections, plus wall or surface repairs. Confirm who receives the equipment information and circuit directories. Those records give management and future contractors a reliable starting point.

Utility planning references: LADWP requirements · SCE requirements

See the work on a real project

What are you looking for?

Call the teamDiscuss your project