Electrical services / Greater Los Angeles

Switchgear and switchboard replacement for operating properties

Plan the equipment and the installation together. We replace and upgrade switchgear, switchboards and disconnects for commercial and multifamily properties, with attention to capacity, access and the people who depend on the power.

Arrange a distribution walkthrough
Switchgear wiring work
Switchgear wiring work. Actual company project photograph. Explore the project library

Keep equipment ordering and shutdown readiness separate

Switchgear and switchboard replacement depends on the specified equipment, its route into the building and the agreed installation sequence. Ask the project team to record the status of each checkpoint.

Configuration reviewed
Identify the current equipment drawings and the people reviewing ratings, connections, dimensions and utility requirements. Resolve proposed substitutions through the project team.
Order authorized
Record the equipment being ordered, the approving party and supplier confirmation. Keep unresolved selections visible instead of treating a quotation as the final equipment record.
Delivery and access arranged
Confirm the expected delivery with the supplier and assign receiving, storage and equipment-access responsibilities. Update the project team if those conditions change.
Electrical work and shutdown schedule confirmed
Review equipment readiness, applicable approvals, utility coordination and the property’s operating arrangements before issuing a confirmed shutdown window.

A quoted lead time or delivered cabinet is one part of the schedule. Ask what must be confirmed next and who will provide that confirmation.

Eaton’s switchboard guide distinguishes layout information from drawings for configured equipment. Siemens’ instruction guide addresses receiving, storage and installation. Use documents for the actual equipment selected.

Lynwood veterinary hospital: electrical renovation

Our scope at this Lynwood veterinary hospital covered electrical work throughout the facility: examination rooms, surgical rooms and equipment booms, X-ray and laboratory equipment, waiting areas and exterior lighting. The 600A single-meter service equipment is shown above.

Explore the veterinary hospital electrical project

Coordinate the work around an occupied property

Tell us who uses the building, which equipment must be considered and who manages access. We coordinate with the utility, engineer, property manager and other trades as the project requires. Shutdown timing and any temporary power arrangement are assessed before the installation sequence is agreed.

Thermal inspection can support the assessment

We have our own thermal imaging equipment and can discuss including a thermal inspection in the project. The proposal identifies the inspection scope and any additional testing or specialist services. A thermal image is one part of an assessment; it does not establish the condition of every component or guarantee that equipment is free of defects.

Prepare a distribution scope for review

For an estimator or project team

Send the current one-line, drawing revision and available equipment schedule. Include existing nameplate records, known loads, the serving utility and the project stage.

Identify the requested bid date, scope exclusions and equipment already specified or ordered. Share only photos that can be taken safely without opening electrical covers.

Invite an electrical bid

For a property operator

Tell us which spaces and shared systems the equipment serves. Include work-hour limits, access to the electrical room and the person responsible for coordinating interruptions.

A walkthrough can establish the information still needed for the proposal. Equipment availability and the agreed utility sequence shape the schedule.

Arrange a distribution walkthrough

For a different scope, see main electrical panel upgrades or shared meter-bank replacement.

From our project photographs

A closer look at the work.

Electrical work across 14 buildings and a clubhouse

The completed Culver City project included 15 common-area and elevator switchgear assemblies, each 400A three-phase. Those assemblies were a separate scope from the project’s 532 meters and approximately 350 in-unit subpanels. The metering sections included 600A single-phase 120/240V disconnects.

Older meter-bank and disconnect equipment in a basement equipment area, before replacement.
Existing equipmentOlder meter-bank and disconnect equipment in a basement equipment area, before replacement.
Crew members work beside open electrical service equipment and existing conduits in a basement equipment area.
Work in progressCrew members work beside open electrical service equipment and existing conduits in a basement equipment area.
A wide view of multiple meter sections and a central service cabinet connected to overhead conduits.
Installed meter-bank viewA wide view of multiple meter sections and a central service cabinet connected to overhead conduits.

Photographs show stages across different equipment sections of the complex. The meter-bank views illustrate the metering work. See the three completed Culver City equipment scopes.

Explore all project photographs →

Common questions

Will the building need to lose power?

The required isolation depends on the system and the work. Some projects may be staged, while others need a complete shutdown. We review the affected loads, utility steps and reconnection requirements before confirming the plan.

Can you replace associated subpanels and meter equipment?

Yes. Our work includes multi-meter equipment, disconnects, switchgear and subpanels. We assess which parts belong in the replacement scope and coordinate the work as a project.

What should we provide for an initial discussion?

Share the property city, the reason for the work, available drawings, equipment records and any utility correspondence. Photos taken from a safe, accessible position can help. Please do not open energized equipment to take photographs.

Technical planning notes & references

BEFORE WE QUOTE THE WORK

Distribution equipment needs a coordinated specification

Match ratings to the system

Service voltage and phase, bus rating, available fault current, interrupting ratings and protection arrangements need review together. Physical fit is only part of compatibility. Equipment records help, but field verification establishes what is actually being changed.

Plan access and shutdowns

Working space, rigging access, cable routes and the isolation sequence can shape the project. Check replacement-equipment lead times before scheduling a shutdown. Define testing, settings, labeling and turnover information with the project team.

Utility planning references: LADWP requirements · SCE requirements