Skip to content
Ai Builders Electric
Discuss your projectContact

Electrical services / Greater Los Angeles

Subpanel replacement for apartment units, homes and businesses

Whether the job involves one panel or hundreds of units, the scope needs to account for the feeder and the circuits it serves. We assess existing equipment, planned loads and access before defining the replacement work.

Request a subpanel assessment
Open circuit breaker panel beside stacked lighting controls and blue control enclosures in an electrical room.
A breaker panel beside lighting controls in a commercial electrical room. Explore the project library

One panel or a property-wide program?

One home, unit or business

Tell us what the panel serves, the reason for replacement and any planned equipment changes. We will discuss the feeder, affected circuits and access for that location.

Discuss one subpanel

Multiple apartments or condos

Start with the approximate unit count, any recurring panel types and the property contact who can coordinate access. A scope review can identify differences between unit layouts before a rollout is planned.

See how a multi-unit program is scoped

Scope the unit work before planning the sequence.

An occupied-building program needs agreement on the electrical work and the practical details of entering each unit. These are the decisions we review with the property team.

DecisionWhat to establishWho contributes
Representative unitsPanel types, unit layouts and known differences that could change the scope.Property records and an electrical site assessment.
Feeders & circuitsExisting supply, upstream protection, affected circuits and any work beyond the cabinet.Electrical assessment; engineering input where needed.
Access & noticesUnit-entry arrangements, occupant contacts and the proposed sequence before dates are agreed.The owner, manager or HOA and the project team.
Walls & finishesWho handles opening, patching, painting and finish restoration, and what the proposal includes.The property team, electrical contractor and other trades.
Handoff recordsCircuit directories, unit-by-unit completion records and applicable inspection closeout.The electrical contractor and the designated property contact.

Look beyond the enclosure

A larger panel does not increase the capacity of the feeder supplying it. We review the existing supply, upstream protection, equipment condition and circuit arrangement before recommending a replacement. Where an approved repair is practical, that can be discussed alongside replacement.

Open electrical panel with two columns of labeled breakers, main disconnects and overhead metal conduit.
Breaker-panel interior during electrical installation.

Plan unit and common-area work together

In a multifamily property, subpanels may serve individual apartments, house loads or shared equipment. We identify what will be affected and coordinate access with the owner, manager or HOA representative. If the project also involves meters, switchgear or the main service, the scope should show how the work fits together.

Keep unit exceptions visible during the program

Once a multi-unit scope is agreed, use one record per unit or panel to track access, approved work and outstanding items. A total count alone can hide the reason a particular location is still open.

Ready to schedule
The applicable scope is identified and the property contact has arranged access. Record the current scope revision and any preparation still required.
Needs a decision or return visit
Record the specific access issue, different condition or proposed extra work. Identify who must respond and keep the item open until the next step is agreed.
Work done; records pending
Separate completed installation from a circuit directory, agreed testing record or applicable inspection document that is still outstanding.
Handoff recorded
Record receipt of the agreed documents and identify any remaining work by another trade. Keep the property’s master list and individual records consistent.

Copyable unit record: Building/unit [reference] · Scope [revision] · Access [status] · Work [status] · Exception [decision reference] · Documents [received / pending] · Next action [owner].

Use neutral unit references in shared summaries. Keep occupant contact details and access instructions in the property’s private records. The closeout index can organize the final panel documents.

Completed multifamily panel work

Our Culver City project included approximately 350 in-unit subpanel replacements within a larger 14-building and clubhouse upgrade. The Los Feliz project included nine subpanels and eight meters.

The Los Feliz photographs below document the exterior metering work. The subpanel quantities describe the confirmed project scope, rather than what is visible in those photographs.

If you need an additional panel rather than replacement of an existing one, see new subpanel installation. For a written carrier request, see insurance-requested electrical work.

From our project photographs

A closer look at the work.

Metering and subpanels in Los Feliz

This completed multifamily electrical project involved eight meters and nine subpanels. The photographs show wall preparation, conduit connections and the installed meter equipment.

Exposed framing beside exterior electrical equipment during wall preparation at a multifamily property.
Wall preparationExposed framing beside exterior electrical equipment during wall preparation at a multifamily property.
Metal conduits connect electrical enclosures within an open exterior equipment area at a Los Feliz multifamily property.
Conduit detailMetal conduits connect electrical enclosures within an open exterior equipment area at a Los Feliz multifamily property.
Exterior metering equipment with round electric meters, a service cabinet and conduit on a stucco wall.
Installed meter bankExterior metering equipment with round electric meters, a service cabinet and conduit on a stucco wall.

Explore all project photographs →

Common questions

Do I need to replace the main panel too?

That depends on the existing main panel, feeder and proposed loads. A subpanel issue does not automatically require a main-panel replacement. We review the connected equipment and explain whether the work needs to extend upstream.

Can you replace subpanels throughout an apartment property?

Yes. We handle in-unit and house subpanel work for multifamily properties. The number of panels, access arrangements and building distribution determine the installation sequence and any interruption plan.

Can the existing enclosure be reused?

Sometimes an approved repair is available, but compatibility and condition must be checked for the exact equipment. Physical fit alone does not establish whether a component is suitable.

Technical planning notes & references

BEFORE WE QUOTE THE WORK

Look at the feeder as well as the cabinet

Check the existing supply

Feeder conductors, upstream protection, enclosure condition and intended loads need review. A larger replacement cabinet does not automatically permit a larger load. Corrections may extend beyond the panel itself.

Identify what will be interrupted

Specify compatible equipment and a useful circuit directory. Clarify circuit identification, testing, affected loads and whether permits or feeder work are included. That makes the scope easier to compare and the installation easier to maintain.

See the work on a real project

What are you looking for?

Call the teamDiscuss your project