Project record by Ai Builders Electric
- MultifamilyProperty type
- 2Meter bank sections
- 400 ampsDisconnect rating per section
- 24Meter positions per section
- 48Total meter positions
One section and the complete project
The installed view at the top of this page shows one section. A second section is shown in the lower project photographs.
| Equipment scope | Disconnects | Meter positions |
|---|---|---|
| First section | One 400A disconnect | 24 |
| Second section | One 400A disconnect | 24 |
| Complete project | Two separate 400A disconnects | 48 total |
Meter positions describe the installed equipment. Confirm the apartment and house-meter allocation separately when preparing a new project scope.
Meter equipment before and after replacement
These photographs show the existing and installed equipment at the same Van Nuys project. The before photograph is a close-up. The installed view was taken from farther away.


Drag the slider or use the arrow keys. Use either button to see the entire view.
Planning a similar replacement
Share the number of sections and meter positions, the known disconnect ratings and who coordinates access. Existing equipment records and a one-line drawing are useful when available.
For hiring and bid details, see our meter bank replacement service. Owners can request a walkthrough; estimators can share plans for a bid. Use the equipment scope worksheet to keep confirmed counts and open questions together.
More views of the work

