Skip to content
Ai Builders Electric
Discuss your projectContact

Electrical services / Greater Los Angeles

Commercial Lighting, Retrofits, LED Conversion, and Parking Areas

Better lighting helps people see the work, find their way and feel comfortable in the space. We plan commercial lighting, LED retrofits and parking-area installations around the layout, controls and hours your business keeps.

Discuss your project
Linear lights across a commercial interior
Linear lights across a commercial interior. Actual company project photograph. Explore the project library

Review the space before choosing a retrofit

A work area, customer-facing room and storage area may need different fixture placement and light distribution. Describe the lighting problems and the changes you want. Available fixture schedules, maintenance records and tenant-improvement plans help distinguish selected repairs from a wider retrofit. The proposed work should make clear what stays, what changes and which controls are included.

Exposed metal conduits, ducts and suspended linear lights above benches and cabinets in a workroom.
Lighting installed by Ai Builders Electric in a Los Angeles college workroom.

Compare what stays and what changes

An LED proposal should describe the system being changed, not just the number of replacement lamps. Compare these scopes against the problems in your space.

Selected repairs
Identify the failed fixtures, drivers or controls and the cause to investigate. Confirm the compatible replacement and any access needed.
Fixture or driver replacement
List the equipment being replaced and the controls or wiring proposed for reuse. Check compatibility and whether the resulting light distribution suits the room.
A wider lighting redesign
Review fixture layout, control zones, occupancy and daylight response, emergency or exit lighting interfaces, and the applicable documentation.

Energy-code requirements depend on the actual work and permit. For a savings estimate, compare existing and proposed equipment with operating hours and electricity costs; no fixed payback is assumed.

Account for parking areas and business access

For exterior lighting, identify entrances, parking spaces, walking routes and equipment locations. Tell us which areas must remain available to customers, staff or deliveries. The estimate should distinguish repairs, replacement fixtures and wider electrical changes, with access, permit responsibilities and related property work identified before installation.

Small globe pendant lights suspended at different heights in a glazed stairwell with black metal framing and warm perimeter lighting.
Globe pendants and perimeter lighting in a glazed stairwell.

FROM OUR PROJECT PHOTOGRAPHS

Globe pendants and perimeter lighting

Globe pendant lights hang at different heights within a glazed stairwell, alongside warm perimeter lighting. The project photograph shows how the fixtures sit within the tall, open space.

  • Globe pendant fixtures
  • Perimeter lighting
  • Glazed stairwell
Explore the project gallery →

Common questions

Can you schedule lighting work around business operations?

Tell us your operating hours, access restrictions, and the areas that must remain available. We discuss scheduling after reviewing the scope. We will talk through whether the work can be staged outside your busiest hours, though the installation plan and timing still depend on the project and the access required.

Will an LED conversion reduce my bill by a fixed amount?

There is no single savings figure that applies to every property. Results depend on the equipment replaced, the new lighting system, operating hours, controls, and electricity costs. Compare the existing and proposed equipment, operating hours and controls before estimating savings or payback.

Can you work on parking area lighting?

Yes. Parking area lighting is part of our commercial lighting services. The scope depends on the fixtures, supporting electrical installation, site access, and the areas you want illuminated. Share property photos or plans and describe the current problems so we can begin reviewing the project.

Technical planning notes & references

Plan lighting documents and acceptance responsibilities

For permit applications on or after January 1, 2026, California uses the 2025 Energy Code. The applicable lighting measures and tests depend on the project scope.

Before equipment is ordered
The project’s compliance documents should identify the lighting measures and acceptance tests that apply. Confirm who prepares those documents and resolves design questions.
During installation
Keep approved fixture and control information with the installation records. Agree on who records substitutions, control settings and the installation certificates that are required.
Before closeout
Where lighting-control acceptance tests are required, arrange a certified acceptance test technician and identify who supplies the completed acceptance documents to the inspector.

Confirm the test provider, required qualifications and document-delivery responsibilities in the project scope.

Official references: 2025 Energy Code, CEC acceptance-testing guidance and compliance, installation and acceptance forms.

What are you looking for?

Call the teamDiscuss your project