What to gather for a multifamily meter and panel replacement

Start with a list of the affected buildings, meter banks and panels. Put a location and an equipment label beside each entry, then mark what needs verification. This gives your electrician a way to distinguish shared service equipment, unit panels and common-area loads before defining the replacement scope.

By Ai Builders Electric · Updated

Ai Builders Electric · Multifamily project planning

Apartment meter and panel scope worksheet

Print a blank copy and complete one sheet for each building or equipment group. Use existing records; mark unconfirmed details “unknown.” Keep resident names, account numbers and access codes off this sheet.

Property and equipment scope · Date: ____________________
Record from available informationYour notes / items to verify
Property city and building / equipment reference 
 
Buildings and dwelling units involved
Keep these counts separate.
Buildings: __________ Units: __________
Shared meter equipment
Sections, known meter positions and serving utility
 
 
Unit panels
Known quantity, brand/model in records, unit types to review
 
 
Shared distribution and house loads
Common-area panels, elevators, gates, laundry or other loads, if present
 
 
Available records / missing records
Drawings, revision, directories, utility notes and safe exterior photos
 
 
Access and coordination
Authorized contact’s role, occupied areas, unit-entry and work-hour constraints
 
 
Project stage and timing
Initial review, bid or planned work; bid deadline or requested completion date
 
 
Open questions and requested scope
Reason for work, items requiring a field check, known exclusions
 
 

Keep electrical covers closed. Leave unreadable labels and uncertain equipment identification for the electrician to check.

Use safe photographs to show context

From an authorized, safe position, take a wide photo showing where the equipment sits and a closer photo of any readable exterior labels. Keep covers closed and stay clear of damaged or exposed equipment. If the label cannot be read safely, mark it as unknown and leave it for the electrician. Use the same worksheet reference in the photo name and keep resident names, account details and private access information out of the photo set.

Compare the returned proposals on the same scope

Put proposals beside the same equipment list and drawing revision. For each item, mark included, excluded, allowance or not stated before comparing the totals.

Same starting information
Check the buildings, meter positions and unit-panel counts. Confirm that each bidder received the same revisions and answered the same scope questions.
Equipment and related work
Compare equipment supply, removal, feeder or circuit work and labeling. Identify responsibility for wall openings, patching, painting and other construction.
Work around the property
Check access coordination, proposed work hours, utility responsibilities and any temporary-power allowance. Ask what still needs confirmation before dates can be agreed.
Completion and exclusions
Compare the agreed inspection records, equipment documents and follow-up work. Keep optional additions separate from the base scope.

Send a short list of differences back to each bidder for clarification. A line that is absent from a proposal needs an answer before the board or owner treats the prices as comparable.

Related consumer guidance: CSLB on comparing written bids and checking contractors.

Turn open questions into written scope decisions

A missing label, a concealed condition and an owner-requested addition need different answers. Record the question and who will resolve it before treating an allowance or possible change as agreed work.

Describe the open item
Use the building or equipment reference. Note the record or field check needed and the person responsible for obtaining it.
Request the proposed response
Ask whether the answer changes the equipment, work included, price or timing. Keep an optional addition separate from a correction to the current scope.
Keep the decision with the proposal
Record the authorized decision-maker’s written response and the revised scope reference. Update affected access or scheduling discussions when the agreed work changes.

Copyable decision record: Item [reference] · Question [detail] · Information needed [detail] · Response owner [role] · Price/timing effect [stated or pending] · Decision [pending or written reference].

Keep utility correspondence with the record. Equipment selection and ordering still depend on the requirements confirmed for this property.

Related consumer guidance: CSLB on recording the agreed work and changes.

Send an equipment scope for review

Share the completed sheet and available plans through your project team. Include a plan link in the inquiry or email the records to production@aibuildersinc.com. Tell us which counts are confirmed and which still need a site check.