Gather the current drawings, specifications, addenda and due date before requesting an estimate. Use this guide for the bid package; the rough-in guide covers coordination during construction.
Open the bid checklistAssign scope decisions, resident access, utility coordination and closeout responsibilities. Use this guide to organize the people and sequence; the meter-and-panel worksheet records equipment details.
Open the occupied-building guideUnderstand what a repeated trip can mean, what to report, and when an electrician should investigate.
Read the guideThese protective devices address different hazards. Understand the labels before discussing an upgrade.
Read the guidePlan protection for sensitive equipment while understanding the limits of surge protective devices.
Read the guideChoose suitable equipment, plan the electrical supply, and recognize when a charging setup needs attention.
Read the guideRecognize changes that need attention without trying to diagnose a hidden fault yourself.
Read the guideUnderstand monitoring, automatic load control, and the questions that determine whether a system fits your home.
Read the guideMatch lighting controls to your fixtures, wiring, and daily routines before selecting hardware.
Read the guideUnderstand hardwired and combination alarms, replacement planning and how household alarms differ from commercial fire-alarm systems.
Read the guideCompare lighting, occupancy sensors, daylight controls, energy monitoring and managed EV charging around the way your property is used.
Read the guideExplore official resources for alarms, surge protection, electrical distribution, energy management, lighting controls and EV charging.
Explore the equipment libraryA planning guide for new ADUs and garage conversions. Gather the equipment list, review existing service capacity and ask about the wiring route and utility requirements.
Read the guideWhat to gather for a public works electrical bid, including plans, addenda, shutdown coordination and contractor documentation. See California DIR references and a campus example.
Read the guideWhat to do when water reaches outlets, appliances or electrical panels. Learn when to stay out, who to call and what to report before power is restored.
Read the guidePrepare for a multifamily meter bank or panel replacement. Build a scope list from property records, safe exterior photos and field checks.
Read the guideCoordinate commercial electrical rough-in, from equipment locations and field changes to inspections before walls, ceilings or trenches close.
Read the guideCalifornia requirements and product instructions
The 2025 California Electrical Code took effect January 1, 2026. Requirements for your work depend on the location, permit context, equipment and applicable local amendments.
California Building Standards Commission code resources. Each guide also links to its relevant safety and manufacturer sources.