Project record by Ai Builders Electric
- Los Feliz, Los AngelesLocation
- MultifamilyProperty type
- 8Meters installed
- 9Subpanels installed
- CompleteStatus
Two completed work packages
Eight meters
The shared-metering scope is documented in the exterior equipment photographs. The project views show wall preparation, conduit connections and the installed meter bank.
Plan meter bank replacementNine subpanels
The completed project record also includes nine subpanels. For a similar panel program, identify the affected units, available circuit records and who arranges access.
Plan unit-panel replacementThe exterior photographs document the metering work. The subpanel quantity comes from the completed project record; interior panels are not pictured here.
What the photographs show
One view shows exposed wall framing beside the electrical equipment. A second shows the conduit and enclosures at the service area. The meter-bank photograph shows the installed exterior equipment with its associated conduit.
Planning a similar multifamily upgrade
Tell us how many meters and subpanels are involved, where the equipment is located and who can coordinate access. Share any existing electrical plans, utility correspondence and known access restrictions so we can discuss the scope.