Skip to content
Ai Builders Electric
Discuss your projectContact

Electrical work in Pasadena.

Rewiring, lighting, service equipment and construction electrical work for Pasadena homes, businesses and multifamily properties. We plan renovations around the existing building and the changes you need.

Completed public-works project in Rancho Cucamonga, shown as regional company experience; not a Pasadena project.
Completed public-works project in Rancho Cucamonga, shown as regional company experience; not a Pasadena project.

Historic-building electrical planning in Pasadena

Pasadena has a formal historic-preservation program. For an older or designated property, begin by identifying its status, the proposed scope and any required design or permit review. Electrical upgrades may involve rewiring, panel replacement, new equipment circuits or lighting while working around existing finishes and access. We do not assume every older building has the same wiring condition or that a particular installation is exempt from review.

Residential wiring and architectural fixtures

For whole-house, partial or knob-and-tube rewiring, identify rooms being renovated, finishes to retain and available wall, ceiling or underfloor access. The electrician reviews which existing circuits can remain and how new work will connect.

Before scheduling, agree who opens access, who patches and paints, and how occupied rooms will be handled. For a designated property, share any preservation review or permit direction with the project team. Pasadena’s historic-preservation guidance is the local starting point.

Schedule a rewiring walkthrough

Commercial improvements and occupied multifamily buildings

A commercial fit-out and an occupied apartment upgrade create different coordination needs. Commercial scopes can include distribution, lighting controls, equipment circuits and network wiring. Multifamily work can include meter banks, switchgear and unit subpanels. Tell us about occupied areas, access restrictions and existing equipment so those conditions can be considered during scope planning. Scheduling and interruptions are project-specific.

Public works: scope and procurement readiness

For Pasadena institutional or public-works enquiries, supply the solicitation, plan set, electrical scope, addenda and required bid date. Request current licensing, insurance and DIR information for the procurement file. We have completed public-works electrical work in Rancho Cucamonga, including two-building and TI-related work, kitchen and office wiring, backup generator/ATS equipment and outdoor lighting. Project-specific compliance, bonding and reporting requirements must be checked against the contract; registration is not a blanket qualification for every tender.

Permits, preservation and a useful next step

Pasadena’s Permit Center provides building-and-safety and historic-preservation contacts. Use the city’s current guidance for the actual property and scope. Bring available plans, photographs, equipment schedules and any relevant review requirements to the electrical discussion. We can then separate known work from items that need design, site review or further clarification before pricing.

If the renovation also changes the electrical service, use Pasadena Water and Power’s new or upgraded service process. Its planning guidance starts with a meter spot; share the resulting utility direction with the project team before equipment and service routes are finalized.

Questions before you get started

Can an older Pasadena home keep its finishes during an electrical retrofit?

The access plan depends on the building and the proposed work. Identify finishes to be retained and available access; do not assume a no-opening installation is possible before review.

Does DIR registration mean every public-works bid requirement is already met?

No. Each solicitation can require its own insurance, bonding, documentation, reporting and qualification information. We review the stated electrical scope and requested documents for that project.

Official local references

Pasadena historic preservationPasadena Permit Center

What are you looking for?

Call the teamDiscuss your project