Tenant improvement electrical bids for Los Angeles build-outs
Turn the new layout into a workable electrical plan. We review the existing supply, incoming equipment and building conditions, then coordinate the fit-out with the other trades.
Include the drawing revision, all current addenda, bid due date and time, and a plan link. Note landlord-versus-tenant work, exclusions and any required site walk.
Bring the proposed use, available base-building plans and equipment list. An initial site visit can help identify existing-condition questions before the scope is priced.
Tenant improvements can include electrical demolition, new distribution and subpanels, lighting and controls, power and data rough-in, equipment connections and final devices. We review drawings and existing conditions with the project team before work is concealed. If site conditions differ from the plans, we identify the effect on scope, cost and schedule so the team can agree on the next step.
Full-floor commercial electrical installation, including conduits, lighting, sensors, controls, circuits, receptacles and switches.
Working to the schedule
We plan electrical work around the construction sequence, access and the other trades. Rough-in, inspections and finish work need to fit the agreed schedule. Tell us about lease dates, occupied areas and any evening or weekend access requirements before pricing. If a change affects our scope or timing, we discuss it with the project team.
Check the space before committing to the layout
Before signing off on a fit-out budget, list the facts you have and the decisions still open. A previous tenant’s setup does not establish what the next business needs.
Proposed use
Describe the rooms, operating hours and equipment being added. Ask the project designer and permitting authority whether the proposed use changes the approval scope.
Building information
Request available electrical drawings, panel schedules and utility correspondence from the landlord. Identify which supply and capacity details still need verification.
Landlord and tenant work
Record who is responsible for base-building changes, suite work, access and shared-system interruptions. Keep unresolved items visible in the estimate.
Selections before rough-in
Mark equipment and lighting still awaiting approval, with a decision contact and needed-by date. Update the scope when a selection changes.
From a bare commercial floor to installed lighting
Starting with a bare floor, our team installed conduits, lighting, sensors, lighting controls, circuits, receptacles and switches throughout the commercial space. These photographs show the floor before fit-out, crew activity and the installed lighting.
Before · empty floorAn empty commercial floor with bare concrete ceiling and floor, structural columns and broad windows.During installationTwo workers on scissor lifts beneath exposed ceiling ducts and conduits in a commercial interior.Installed lightingSuspended linear lights beneath exposed ducts and conduits in an open commercial space with glass-partitioned rooms.
Can you price from a landlord's base-building drawings?
We can prepare an estimate from available drawings and identify the assumptions. Existing conditions may need a site review before the scope and price can be finalized. The estimate explains which items still need verification.
Do you work evenings and weekends on occupied buildings?
We plan the schedule around the building's constraints and will discuss out-of-hours working where the access requires it. It needs to be agreed at the start rather than assumed, because it affects both the schedule and the price.
Who is responsible for the permit on a TI?
It depends on how the project is set up and who holds the general contract. We will confirm in writing who is pulling what before work starts, so there is no gap between the trades. Tell us how the project is structured and we will fit into it.
Technical planning notes & references
BEFORE WE QUOTE THE WORK
A new layout can change the demand
Check what the space is becoming
A previous tenant’s panel schedule is not proof that the supply suits the next use. New equipment, lighting and mechanical loads need review against the proposed layout and available capacity.
Coordinate the visible and concealed work
Conduit, ceiling access, controls and connections need to work with other trades. Trace existing circuits before deciding on reuse. Clarify landlord work, tenant work, inspections and shutdown effects on neighboring occupants.