Electrical services / Greater Los Angeles

Electrical construction for commercial buildings and homes

Good electrical planning starts while the layout can still be changed. We work from the plans and equipment requirements to coordinate service, distribution, rough-in and the finishing details.

Discuss your project
Commercial EMT conduit rough-in
Commercial EMT conduit rough-in. Actual company project photograph. Explore the project library

Define the building and tenant scopes

A new building can be priced as a shell, a finished tenant space or a complete home. Identify the handoff between those scopes before comparing electrical proposals.

Commercial shell
Identify the service and distribution, common areas and work that stops at each future tenant space. Show who supplies later tenant circuits, fixtures and equipment connections.
Tenant build-out
Mark retained base-building equipment and the new tenant loads. A fit-out inside an existing building belongs in the tenant improvement scope.
Homes and ADUs
Include appliances, HVAC, lighting selections and any future EV or storage plans. Keep the ADU supply arrangement explicit.
Rows of wall-mounted control enclosures and metal conduit above electrical panels and an equipment rack.
Electrical-room panels, control enclosures and conduit during installation.

Track the decisions that release the next stage

The construction schedule needs more than an installation start date. Keep unresolved electrical decisions visible to the general contractor and design team.

Before procurement
Confirm the current drawing revision, major equipment data and the submittal approval responsibilities. Separate proposed substitutions from the specified equipment.
Before walls close
Resolve routes, boxes, required inspections and other-trade conflicts. Use the rough-in coordination guide to prepare the walk.
Before energization
Track utility requirements, site readiness and inspection releases separately from contractor installation. Agree on the responsible contact for each dependency.

For SCE-served sites, consult SCE construction and renovation project requests. Confirm the requirements and timing with the utility serving your site.

Carry the scope through the finished installation

As construction progresses, we coordinate fixture and device installation, equipment connections and the agreed closeout work. The proposal identifies permit and inspection responsibilities. Plan changes need a clear discussion of the revised work, price and schedule before that work proceeds.

Common questions

When should I bring an electrician into a construction project?

Contact us when you have enough information to discuss the building layout, intended use, and major equipment. Earlier review can identify electrical decisions that affect the plans. You do not need every fixture selected, but open items should be identified before the installation scope is finalized.

Do you handle commercial and industrial construction?

Yes. Ai Builders Electric serves residential, commercial, and industrial projects. Send the available drawings, equipment requirements, property location, and expected schedule. We review the proposed work before defining the scope, rather than assuming every building or industrial installation needs the same electrical approach.

What happens if the plans change during construction?

A change may affect materials, installation work, access, or scheduling. The revised scope and pricing need to be discussed and approved before the related work proceeds. Share updated drawings promptly so decisions are based on the current project rather than an earlier version of the plans.

Technical planning notes & references

BEFORE WE QUOTE THE WORK

Build the scope from the plans and equipment

Resolve the service early

Utility availability, meter location and proposed loads can affect civil work and procurement. Confirm major appliances, mechanical equipment, EV plans and backup-power goals before finalizing distribution equipment.

Coordinate rough-in and closeout

Routes and boxes need to work with structure, plumbing, mechanical systems and finishes. Schedule inspections before work is concealed. Testing, labels and turnover records complete the job alongside the visible fixtures.