Industrial equipment connections and electrical distribution

A machine’s supply requirements deserve attention before it arrives on site. We review voltage, phase, protection and the installation route, then coordinate the work around access and production needs.

Discuss your project
Real company project photography. Explore the project library

Prepare a machine connection brief

For a new machine or a relocation, start with its actual supply requirements and operating role. A similar-looking machine may have a different electrical specification.

Equipment identity
Provide the manufacturer, model, current electrical submittal and voltage/phase requirements. Mark new, retained and relocated equipment separately.
Location and route
Show the final position, proposed cable or conduit route and any physical access restrictions. The site review establishes the feeder, protection and disconnect scope.
Operating sequence
Identify which machines operate together, planned additions and the supplier contact. Describe the required production window without assuming work can remain energized.

Plan assessment and replacement around operations

Share equipment records, maintenance concerns and operating constraints before the project is scheduled. We can discuss thermal inspection using our own equipment, along with any further testing needed for the agreed assessment. Thermal images can reveal apparent temperature differences; findings still require interpretation and may need additional investigation.

Agree where electrical installation meets the machine supplier

Identify who takes responsibility at each interface before the machine arrives. The electrical proposal should describe the work included on the supply side and any separately agreed controls work.

Supply and distribution
Circuits, feeders, disconnects and connections are reviewed against the equipment data. Whole-building distribution replacement has its own switchgear planning path.
Machine and controls
Confirm who provides factory startup, proprietary software, process programming and performance testing. An electrical supply connection does not establish that those tasks are included.
Return to operations
Agree on the shutdown, testing, supplier attendance and handover records. The operating team identifies who authorizes the equipment to return to service.

Shutdown and electrical safety procedures must be established by the responsible qualified personnel. Keep those procedures separate from a requested production deadline.

Background reference: Fluke: interpreting electrical thermal images.

Common questions

Can switchgear be replaced without shutting the plant down?

Some work can be staged to reduce the area affected, but the equipment and work determine which shutdowns are needed. We review the sequence, operating needs and practical outage window before scheduling installation.

We are installing new machinery. What do you need from us?

Send the manufacturer’s current electrical data, the planned location and any operating or startup requirements. We review the available supply and installation needs, then identify open design questions before defining the scope.

Do you handle prevailing wage work?

Yes. Ai Builders Electric holds DIR registration #1000060370. Send the contract’s labor, reporting and documentation requirements with the drawings so the electrical scope and project responsibilities can be reviewed. Request current registration and licensing documents for the bid file.

Technical planning notes & references

BEFORE WE QUOTE THE WORK

Start with the machine requirements

Use actual equipment information

Voltage, phase, starting characteristics and manufacturer instructions influence the supply. Motors and controls can need different protection and switching from a general-purpose receptacle. Confirm the equipment schedule before committing to distribution changes.

Plan for maintenance and production

Routes, physical protection, disconnects and maintenance access must suit the environment. Shutdown windows and equipment-supplier coordination affect the schedule. Define electrical testing and commissioning responsibilities before installation.