Skip to content
Ai Builders Electric
Discuss your projectContact

Electrical services / Greater Los Angeles

100 to 200 Amp Service Upgrades

A service upgrade changes available capacity; a panel replacement may leave capacity unchanged. We review your loads and plans first, then explain what a 200-amp upgrade would involve at your property.

Discuss your project
Real company project photography. Explore the project library

Panel replacement versus service upgrade

A panel replacement changes distribution equipment. A service upgrade changes the capacity supplying the property and may involve conductors, metering, disconnects and other equipment. A replacement can be appropriate without a capacity increase. We assess the existing system and planned loads so the estimate addresses the actual reason for the work.

Start with the actual electrical loads

The capacity review considers the property’s existing demand and the equipment you plan to add. Tell us about appliances, cooling, EV charging, additions or other changes being considered. The assessment helps distinguish a service upgrade from additional circuits, a panel change or another distribution arrangement.

The utility's part

A service upgrade requires coordination with the serving utility and applicable permit and inspection steps. Overhead and underground services have different site constraints. We identify equipment and route changes, each party’s responsibilities and the proposed sequence before scheduling. Utility review, equipment availability and inspections can affect the overall timeline.

Common questions

Do I need 200 amps for an EV charger?

Not always. The service rating alone does not establish spare capacity for a charger. We review existing demand, charging equipment and any suitable load-management options before comparing the work with a service upgrade. The supported configuration and applicable requirements need checking for the installation.

How long does a service upgrade take?

Installation time and the outage depend on the equipment, route, permits, inspections and utility steps. Discuss the expected sequence and interruption before scheduling. The overall project timeline can differ from the time the property is without power.

Can I upgrade the service without replacing the panel?

That depends on the existing panel, compatible components, service arrangement and reason for the upgrade. We assess which equipment can remain and which must change, then explain those choices in the proposed scope. Age alone does not settle the decision.

Technical planning notes & references

BEFORE WE QUOTE THE WORK

Decide whether 200 amps fits the project

Capacity is a calculation

The right service capacity depends on existing and proposed loads. Load management may be worth considering where suitable. Upgrading a panel label does not upgrade the conductors, meter equipment or utility supply.

Coordinate the entire service

Overhead and underground services have different site constraints. Meter location, utility equipment, grounding and bonding, working space and permits affect the plan. Utility review and inspection availability can affect reconnection. Distinguish the installation outage from the overall schedule and identify any trenching or finish work.

Utility planning references: LADWP requirements · SCE requirements

What are you looking for?

Call the teamDiscuss your project